ManifstManifst Guide
FR Open Manifst

Start from a requirement to complete the backlog

Paste an email, meeting notes or a specification: AI matches it against the existing backlog, completes the right epics and flags what is already covered.

Plan
All plans
Required permission
Tickets › CreateDefault: Product Owner, Scrum Master, Business Analyst, plus the project owner and admins.
Required permission
Epics › CreateDefault: Product Owner, Scrum Master, Business Analyst, plus the project owner and admins.

When to use it

The Launchpad creates a backlog from scratch. Start from a requirement is for a project already under way: a client request, the outcome of a steering committee, an amendment to the specification. AI does not recreate what exists: it attaches the new tickets to the epics concerned.

Launch it

Three entry points:

  • the Start from a requirement line at the top of the ticket, epic and Super Epic creation windows;
  • the Add a requirement to the backlog action in global search (Ctrl+F);
  • from an epic's or Super Epic's page: the requirement is then targeted at it. Widen to the whole backlog removes that targeting.

The steps

  1. Paste the text of the requirement, and/or drop documents.
  2. Analyse the requirement. The maximum credit cost is shown before you start.
  3. Check the proposal:
    • for each part of the requirement, the epic it attaches to (existing, or New epic), which you can change;
    • Already covered by your backlog: what already exists;
    • Outside the backlog: what is not work to plan.
  4. Tickets close to an existing ticket are unticked by default: check them. Untick what you do not want.
  5. Add to backlog.

New epics can be grouped under a new Super Epic.

Project linked to Jira, Azure Boards or Linear

Items added this way are not created in the external tool. Manifst reminds you before adding them.

The cost of each step is in AI credits.

Updated on November 3, 2026

Can't find your answer? Write to us